Seeing the likes of Verbolten destroy Nessie in that Twitter poll result earlier on the page just made me die a little inside.
A little Nessie for the soul.
The ride doesn't have Vekoma trains.Like what, they already have Vekoma trains on the rails and I believe either them out Morgan may have been brought in from time to time to do some track work?
A Vekoma re-tracking of the whole course similar to Python at Efteling would do wonders for the ride when the time for either demolition or renovation inevitably comes. (Let's be real though, Nessie can't actually close, it's going to operate forever.) Apart from the brakes, station, lift, and any other non-high stress area of track the whole course could be re-profiled and re-tracked to allow for a smoother ride experience, as well as alleviating some of the maintenance troubles that the older track brings to the table. I just hope they don't remove any of that classic Arrow coathanger charm on the drops, they can reprofile the entry and exit into the loops all day, but touch the drops and we might have a problem.I could see vekoma giving this old girl "plastic surgery"![]()
Efteling's Python wasn't retracked by Vekoma, but some company called CSM: https://rcdb.com/897.htmA Vekoma re-tracking of the whole course similar to Python at Efteling would do wonders for the ride when the time for either demolition or renovation inevitably comes.
Forgot to post this the other day but there is a water boom setup around the base of Nessie's Final drop and loop. Anyone aware of any maintenance work that would require this?
Regressing the second left chain or something like that also came to mind for me to. It's definitely not painting as she was repainted completely a few years ago and still looks really good.Only thing I can think of, and this is probably wrong, is they've cleaned then regreased the 2nd lift chain so that boom is to catch any potential grease spills into the water from any drops that come off of the trains as they cycle.
Either that or paint, though I think they usually encircle the track section with tarps/plastic and paint usually sinks in water.
We use essential cookies to make this site work, and optional cookies to enhance your experience.