They need bleachers or a pathway along the entirety of the ride for people to stand near by or sit near by and watch the absolute insanity that is an upside down launch and this tower
They need bleachers or a pathway along the entirety of the ride for people to stand near by or sit near by and watch the absolute insanity that is an upside down launch and this tower
maybe we'll get a purple umbrella like BoF![]()
Based on BTS tour shots of the stall, I don’t believe they’re planning on sending pathing underneath it. Which is a shame, when you look in your mockup how the park layout is just begging for it. GK is positioned perfectly to be a crossroads for Bakunawa, Toro, and the Ka plot ride.I think a lot of us are really hoping for improved path network connectivity as more attractions are built out in the old Golden Kingdom area. Something like this:
Well this is certainly disappointing, was hoping they'd go all out theming wise like they did for Poltergeist at FT but I guess not. Hopefully we're all proven wrong but this isn't exactly exciting... Wait.
So the center station switch position is uncovered...?
So if you return to the station and there's a delay in loading the other train, you're just going to be sitting in the sun, baking...?
And as you're waiting in the station, at all but noon, some part of the queue is just going to be roasting in the sun...?
And the center of the station and the station switch and everything is just going to be exposed to the elements...?
Surely not... Right?
Unless there is some super good thematic reason for this decision (which, to be clear, I do not believe there is because the park has been upfront about the scenic package still being a huge work in progress), BIG YIKES.
Edit: Looking at the current photos again, not even the load positions are really covered. If the roof line really is done on that station, this is gonna suck.
A month or two ago I was trying to look for an overhead photo to overlay a ride plot onto but the overhead was outdated from when Ka still existed, glad it's updatedView attachment 44425
Google Earth imagery has been updated to 7/21/2026.
News to me that they paved asphalt over the former plot of Ka's tophat. Guessing earlier this year?View attachment 44425
Google Earth imagery has been updated to 7/21/2026.
It's just gravel, they were using it as overflow parking for a bit.News to me that they paved asphalt over the former plot of Ka's tophat. Guessing earlier this year?
How are you finding this? I only see November 2025?View attachment 44425
Google Earth imagery has been updated to 7/21/2026.
Google Earth Pro desktop program, not the website.How are you finding this? I only see November 2025?
The Ocean County Planning GIS system has a super good, recent aerial.
... Wait.
So the center station switch position is uncovered...?
So if you return to the station and there's a delay in loading the other train, you're just going to be sitting in the sun, baking...?
And as you're waiting in the station, at all but noon, some part of the queue is just going to be roasting in the sun...?
And the center of the station and the station switch and everything is just going to be exposed to the elements...?
Surely not... Right?
Unless there is some super good thematic reason for this decision (which, to be clear, I do not believe there is because the park has been upfront about the scenic package still being a huge work in progress), BIG YIKES.
Edit: Looking at the current photos again, not even the load positions are really covered. If the roof line really is done on that station, this is gonna suck.
We use essential cookies to make this site work, and optional cookies to enhance your experience.