Register or Login to Hide This Ad for Free!
I suspect like they've done with every other aspect of this, they're going to hold off and release theming and station and more details over the coming months to keep attention up heading into the spring debut. Just easy PR and a way to keep the ride in the news.
That would be clever but they should have teased this today in the announcement if they haven’t.
 
I was not being serious. Six flags would never and I would never ask. I will be sure to only post strict facts and keep everything ship shape from now on. We need to keep this 235 page thread of mostly speculation, drama, and memes on topic.
 
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Direct Link to Embedded Media Source

From ElToroRyan's video:
  • Both trains will be the same colour
  • Double-sided lockers will be included
  • Not advertising an official riders/hour at this time
  • The station will have a 'two-layered sliding floor system. One layer which houses both tracks, the other layer which has the platform in the center. [...] the track slides and the platform adjacent slides next to it'
  • Floorless was something they wanted from the start, not just a weight drop measure.
  • Unlike other MACK rides, this is not a fully controlled spin with a motor except to park the train in the load station
 
The two layered sliding floor system seems like a way to work around the connected sliding track? Maybe you will be able to board one side multiple times in the shifted position? In case one side goes down
 
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Direct Link to Embedded Media Source

From ElToroRyan's video:
  • Both trains will be the same colour
  • Double-sided lockers will be included
  • Not advertising an official riders/hour at this time
  • The station will have a 'two-layered sliding floor system. One layer which houses both tracks, the other layer which has the platform in the center. [...] the track slides and the platform adjacent slides next to it'
  • Floorless was something they wanted from the start, not just a weight drop measure.
  • Unlike other MACK rides, this is not a fully controlled spin with a motor except to park the train in the load station


Ok, a couple of things:

Both trains will be the same color ?
Then why advertise the green train in the promo video? That’s very misleading
Not releasing capacity numbers now means they probably arent very good.
And,
Have they ever fully explained the additional height this gained? Or was that 375 filing also a red-hearing and it was always 382
 
Consider Donating to Hide This Ad