Following up today, there has been a new permit issued, to amend the existing storm water plan to utilize the Rhine River for future development, there’s no attachment as of yet. This leads me to believe that this most likely is due to this new coaster seeing that most projects just require a land disturbance permit and maybe a CPF permit, so this would be a very large change, after leaning on some of my colleagues from work on there insight to on this as well, the agreed upon speculation is that they are submitting a substantial plan with dramatic reworking of ground and they have to prove the Rhine can hold and expel water at the needed rate for future expansion. What this could mean, the new coaster will clearly enough land area that enough run off is introduced to require this extra level of approval, I hope this not true sense coasters have every little physical foot prints that would mean we could be looking at another pantheon field clearing design, alternatively this could mean that bgw is submitting a much larger long term plan what would see a much larger area then the coaster will be utilizing with the potential for more buildings paths potential other rides placed in the area and providing appropriate infrastructure to the Rhine to be “future proofed” if you will. That is all speculation with out actual eyes on plans. One thing that is for sure proven by this, that this extra step being taken is one more level of the development red tape that will for sure prove that this project will be even further pushed down the road before we see any physical signs of progress.