PayneTrain said:Why is Busch pushing for a March day when all of their recent rides have launched mid-May?
B-Mac said:Here are the official opening dates for some of their rides (according to RCDB)
Alpengeist: 3/22/1997
Apollo's Chariot: 3/27/1999
Griffon: 5/18/2007
Grover's: 4/3/2009
Big Bad Wolf: 6/15/1984
Drachen Fire: 4/4/1992
Looking from just this batch of names only griffon and BBW didn't open in march or april.
Zoomy said:So I got bad news today about the project so I guess I will talk about what I know to be true. The schedule, this is the tentative schedule that was issued;
The sfx building (building 80) foundation 5/31/11, floor slab 6/16/11, building erection 10/25/11 so we have to wait until Hollowscream to see the building. This building is slam full of stuff, lights, sounds, effects.
The station; selective demo 6/28/11, station reconstruction 9/7/11, theming 11/30/11. The theming is really nice.
The ride; ride fabrication 5/2/11, (where does Zierer build their track? Zierer is the manufacturer) deliver event building track 9/26/11, ride install inside sfx building 9/27/11, deliver remaining track 11/1/11, ride install outside 11/2/11, deliver 1st train 12/15/11, deliver remaining trains 1/16/12, startup and test 2/9/12. The schedule is very aggressive and the intent is to have the ride ready for opening day.
I've heard a couple numbers for the budget, lowest 51 million highest 54 million. We may never know the exact number but it is a huge amount.
I don't think the name is Elementum or Verbolten. I think they've kept the name totally secret, only a few people actually know it. I don't think they are flip flopping on the name like Cheetah hunt, the theming is too specific. The theming is great and I have a few ideas to the story but they are only guesses from what I've seen. They kept the actual theming details pretty vague.
I've seen a lot of the details to this ride and I think it will be really great, not the ultimate thrill ride but something really special and totally different.
Zoomy said:Five are shown, but that may just be a representation and not the actual number. There is something on the trains that require power, there are battery charging stations for the "ride system video batteries" for the trains.
Swiftman said:Elementum > Cheetah Hunt
CarterGee said:Swiftman said:Elementum > Cheetah Hunt
both of those names should die in a fire
Swiftman said:We might as well throw Mach Tower and Europe in the Air in there as well...
CarterGee said:I dont HATE Verbolten. I kinda think it's clever and it definitely fits in with a Black Forest theme.
Swiftman said:We might as well throw Mach Tower and Europe in the Air in there as well...
griffonrox said:Just wondering... How does Verbolten fit with the black forest theme?