Youhow2 said:I bet there are a few Busch management folks reading this right now laughing and w/e having a good ol time.
On average there are 50 to 60 people in an orientation. The park employs over 3,000 people. Thats at least 50 orientations.newsie said:A lot. They have them scheduled throughout the day at this time during the year.Swiftman said:Someone else said that Carl Lum was in the room at the time. Anyone know how many different orientation sessions actually happened?
Scoutn757 said:Youhow2 said:I bet there are a few Busch management folks reading this right now laughing and w/e having a good ol time.
Screenshot this. I am going to agree 100% with this guy for a change.
Swiftman said:Griffonrox, is this sort of what you're talking about?
Key:
Green: Station
Red: Tilt Section/Launch (Horizontal Position)
Orange: Tilt Section/Launch (Vertical Position)
Blue: Track
Purple: Train Movement
Gray: Track Rotation
NOTE:
I have just received yet another tip from a trusted source (not the same one as before) that concurs with what Griffonrox posted above. Is anyone keeping count?
James said:On average there are 50 to 60 people in an orientation. The park employs over 3,000 people. Thats at least 50 orientations.newsie said:A lot. They have them scheduled throughout the day at this time during the year.Swiftman said:Someone else said that Carl Lum was in the room at the time. Anyone know how many different orientation sessions actually happened?
Scoutn757 said:Youhow2 said:I bet there are a few Busch management folks reading this right now laughing and w/e having a good ol time.
Screenshot this. I am going to agree 100% with this guy for a change.
I've thought this the whole time.
Swiftman said:Do you mean that it comes in the front of the station or does it come in the same way it left?
KDcoasterMAN said:That's is what it sounded like...
Then only thing I can imagine is the train leaving the station, then being tilled backwards then launched upward. That would be sweet!
Imagine if it was indoors and themed!
Youhow2 said:It wouldnt kill capacity. Think of the transfer track on Tatsu when they are running both sides... Same thing accept the direction the track leads is different(backwards). As soon as the train loads into the station(and the other train has cleared launch area) the transfer track can switch to the launching section. If capacity is really a concern, the ride can have a double station(not duel, but one with a seperate load and unload). 2 station zones/blocks, 1 pre launch train block, and the launch track itself can hold a train. That actually would probably load pretty fast...
Youhow2 said:It wouldnt kill capacity. Think of the transfer track on Tatsu when they are running both sides... Same thing accept the direction the track leads is different(backwards). As soon as the train loads into the station(and the other train has cleared launch area) the transfer track can switch to the launching section. If capacity is really a concern, the ride can have a double station(not duel, but one with a seperate load and unload). 2 station zones/blocks, 1 pre launch train block, and the launch track itself can hold a train. That actually would probably load pretty fast...
We use essential cookies to make this site work, and optional cookies to enhance your experience.