Finish welding, NDT, paint, theming, trains have to be repainted and rebuilt, the building over the transfer track has to be built, anything mechanical and electrical removed for the track replacement has to be replaced, and anything extra that comes up.
Not to mention the cave still needs reinforcing, and the theming if it’s interactive will require timing and testing.
 
General pictures of construction renovation progress.
 

Attachments

  • IMG_2910a.JPG
    IMG_2910a.JPG
    12.6 MB · Views: 119
  • IMG_2911a.JPG
    IMG_2911a.JPG
    12.5 MB · Views: 116
  • IMG_2921a.JPG
    IMG_2921a.JPG
    10.3 MB · Views: 106
  • IMG_2923a.JPG
    IMG_2923a.JPG
    11.2 MB · Views: 97
  • IMG_2928a.JPG
    IMG_2928a.JPG
    12.1 MB · Views: 130
I appreciate it! Just a thought after riding Tennessee Tornado. It was such a smoother deceleration
 
Not the biggest news but this just in. Additional permit for a 190 square feet so we’re talking like a 15’x15’ building. And it’s almost like it’s coming true sea’s might be in charge of a project that actually receives some theming, can we actually be so lucky?
 

Attachments

  • IMG_8073.png
    IMG_8073.png
    31.5 KB · Views: 64
Not the biggest news but this just in. Additional permit for a 190 square feet so we’re talking like a 15’x15’ building. And it’s almost like it’s coming true sea’s might be in charge of a project that actually receives some theming, can we actually be so lucky?
SEAS does do theming, but only when they save money somehow (existing station/building/ride)
 