Will it be open Sunday? In class rn so can't check myself
Confused Thinking GIF
 
So far the project files have been protected but the bay permit, is now available, interesting to see the park is building some kind of building/ structure right before the first lift hill. But this drawing set also shows a little of the structure to be placed over the track at the final brake run seems as if it’s going to be is own structure and not an extension of the station.
 

Attachments

  • IMG_7882.jpeg
    IMG_7882.jpeg
    785.9 KB · Views: 277
  • IMG_7883.jpeg
    IMG_7883.jpeg
    1.1 MB · Views: 275
Was there an extension of the station planned before and it's been changed?
It was discussed earlier in the thread it was originally in the plans, it’s a multiple purpose building, protect riders from the elements during slow unload times, protect riders from dropped devices on alpengeist, and also a good structure to protect the trains when parked outside.
 
I think it's a fake-out using part of the original track as scenery. The proposed structure inside the prelift turnaround and the three weird box things are also related I believe.

The rumor I heard a while back was that there was going to be some sort of notable set piece/storytelling element (facade/diorama?) during the pre-lift portion of the ride. It is one of the things I've been keeping silent about out of a fear that it could have been budget cut away. These plans give me a lot of hope that it's still slated to happen though! 😍

Taking stock of what I'm tracking publicly (official and rumored) thus far:

Updated queue, updated station, prelift scene, lift audio, Loch Ness "sighting" on the first drop, new cave effects with the monster featured, new final brakes shade structure, new train styling, 900ft of new track, new ride programming, and a full coaster repaint.
 
Last edited:
I think it's a fake-out using part of the original track as scenery. The proposed structure inside the prelift turnaround and the three weird box things are also related I believe. The rumor I heard a while back was that there was going to be some sort of notable set piece/storytelling element (facade/diorama?) during the pre-lift portion of the ride. It is one of the things I've been keeping silent about out of a fear that it could have been budget cut away. These plans give me a lot of hope that it's still slated to happen though! 😍

Taking stock of what I'm tracking publicly (official and rumored) thus far:

Updated queue, updated station, prelift scene, lift audio, Loch Ness "sighting" on the first drop, new cave effects with the monster featured, new final brakes shade structure, new train styling, 900ft of new track, new ride programming, and a full coaster repaint.
That is so awesome to hear, for the most part engineers are super proper so it would be odd for them to leave an error on a drawing set, but that track wasn’t in the “defined area of the scope of the permit” so it would have been okay to leave on there. It’s awesome to have a hint of what we have going on. It seems as if the park is putting in a great effort and preserving everything we hold dear about Nessie while very much providing a new ride experience.
 
Last edited:
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Direct Link to Embedded Media Source

To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Direct Link to Embedded Media Source

To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Direct Link to Embedded Media Source

To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Direct Link to Embedded Media Source
 
Status
Not open for further replies.
Consider Donating to Hide This Ad