Register or Login to Hide This Ad for Free!
Status
Not open for further replies.
Yeah, definitely won't happen.

There's probably some weird, alternate history where Schwarzkopf could have ended up with the LNM project back in the 70s though. Interlocking, circular Schwarzkopf loops would have been quite the sight!

Interlocking Arrow loops are quite the sight already. In my opinion, they're much better looking. The loop arcs on Arrow loops and corkscrews are so beautiful to me compared to the simplistic Schwarzkopf arcs.
 
I'd love to see another company like Mack or Intamin try out the interlocking loops one day. Would be cool to see like a Mack extreme spinner with interlocking loops. Maybe skyline could make some weird version of their skywarp that's just 2 loops inside each other.
 
  • Like
Reactions: Mwe BGW
Do we know of they are/have removed or worked on, the sections in and out of the helix that had the two rough transitions?

That's the most problematic areas. Would be a shame if they leave them.
 
Better question - without any planned support structure rehab, is it possible they could even adjust the existing profile?

Rough answer is yes but not in any way that would significantly change the rider experience. I'd expect the loops to feel slightly different. The transition out of the mountain, based on what track we see staged over there, looks to be identical to what's currently there.
 
Ooh, the fact that it's not just "train" makes me think new art or something more

Well, it wouldn't be a train since the trains aren't being replaced and the current ones are from S&S.

Presumably Premier will talk about process (3D scanning the track, fabricating exact replicas, etc) and maybe they'll have a track section or something to show?
 
If anything, sharing it and pointing out that it's "wrong" is just putting more eyes on the marketing material. I'm not saying it's intentional, but the technical details of an attraction that aren't marketable statistics are not prioritized things to be "accurate".
 
  • Like
Reactions: Chorizo and Fiender
Hopefully someone will post a better complete video sometime later today. But premier officially confirmed it on there end along with some not so new details. It’s just my opinion but I keep going back to lcd screen when they talk about the in the cave effects and now “new technology “
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Direct Link to Embedded Media Source

Shout out to Orlando amusement for the tweet
 
I'm surprised they didn't talk at all about the process or even have a diagram or something on hand showing what track segments are being replaced. Feels like Premier and SEAS are content to say "We're doing this. Be excited." Hopefully they will provide more detailed, specific information in the weeks and months ahead.

For instance, I've heard a lot about what theming is/was, specifically, planned but I'm very, very hesitant to talk about any of it publicly since that's the part of this project that could change and shift right up until the very end. I'd feel a lot better about the prognosis of everything (read: that none of it has been budget cut away) if they'd start publicly committing to more of it in detail.
 
Status
Not open for further replies.
Consider Donating to Hide This Ad