Register or Login to Hide This Ad for Free!
Yeah, a TOTAL crew of two, right?

Op 1: Controls and Unload-side Restraints
Op 2: Load-side Restraints
That's just awful. Definitely a result of low employees. Assuming they schedule it that way and it's not a day of call off issue, they only need to hire 5 or 6 people for the ride period (2 positions with 1 breaker to run the ride for a day, rotated though each day so everyone has at least 1 day off each week). For reference, in my day a 4 person staffed ride may hire 15-20 people for peak season. The largest I did was Verbolten at 35 (10 total positions with 3 breakers).
 
Last edited:
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

I am bummed that I never got the credit for the Loch Ness Monther can anyone tell me if it was a good coaster?
 
  • Haha
Reactions: Mwe BGW
  • Like
Reactions: Brambo and Zachary
I love how they stripped out the valuable pieces to them and pretty much just left the fiberglass shell and seat cushions for the auction... lol, still a neat idea to raise money for a good cause
 
I love how they stripped out the valuable pieces to them and pretty much just left the fiberglass shell and seat cushions for the auction... lol, still a neat idea to raise money for a good cause
My understanding was much if not all that was stripped is on the current trains which still use the old chassis
 
  • Like
Reactions: Jonesta6
Consider Donating to Hide This Ad