I just want another (or an expanded!) water ride...This could also be a perfect spot for United to jump in on the Vekoma family boomerang market. That plot is perfect for it.
I just want another (or an expanded!) water ride...This could also be a perfect spot for United to jump in on the Vekoma family boomerang market. That plot is perfect for it.
We know they're willing with both Catapult and Infinity Falls, and perhaps a package deal was bought including BGT, who hasn't gotten a new water ride in 40+ yrs. One can dream of a giga splash with Tidal Wave theming, but I don't know how much they're willing to work with Intamin on a water ride given how trimmed Catapult is running.I just want another (or an expanded!) water ride...
I mean. They knew the ride itself was a prototype so not all the bugs had been worked out so I mean, you reap what you sorrow. I think a Giga Splash would be a perfect addition for guests to beat the Florida HeatWe know they're willing with both Catapult and Infinity Falls, and perhaps a package deal was bought including BGT, who hasn't gotten a new water ride in 40+ yrs. One can dream of a giga splash with Tidal Wave theming, but I don't know how much they're willing to work with Intamin on a water ride given how trimmed Catapult is running.
They just added a family coaster and there’s always 3 other rides with one train… that’s not a good idea hahaThis could also be a perfect spot for United to jump in on the Vekoma family boomerang market. That plot is perfect for it.
Could ask Vekoma for one with a transfer table stationThey just added a family coaster and there’s always 3 other rides with one train… that’s not a good idea haha
I think the boomerang is one of the worst designs , so many better optionsThis could also be a perfect spot for United to jump in on the Vekoma family boomerang market. That plot is perfect for it.
Given that BGT is currently having an obscene amount of issues with their other S&S product (Serengeti Flyer) that has since caused downtime in which required work walls to go up around the ride, I find it unlikely they’d want to work with S&S at this time. My understanding is BGT is also in the process of suing S&S, as the issue at hand involves basically building an entirely new ride on the inside, which is the expensive part.What about a small Axis Coaster
Oh, I wasn't aware of that information. I also think a coaster like Hangtime at Knott's could be realistic. They could market it as the steepest drop in Florida. It would also fit quite well into this footprint.Given that BGT is currently having an obscene amount of issues with their other S&S product (Serengeti Flyer) that has since caused downtime in which required work walls to go up around the ride, I find it unlikely they’d want to work with S&S at this time. My understanding is BGT is also in the process of suing S&S, as the issue at hand involves basically building an entirely new ride on the inside, which is the expensive part.
Not for a whileDoes anyone know when they plan on removing the coaster? I went to the park on 10/14 and the only thing that has been done to the ride is the sign removal and a work wall blocking the entrance. Everything including the lockers is still on site.
She's going to be up for a bit. Like I reckon most of 2025.Does anyone know when they plan on removing the coaster? I went to the park on 10/14 and the only thing that has been done to the ride is the sign removal and a work wall blocking the entrance. Everything including the lockers is still on site.
We use essential cookies to make this site work, and optional cookies to enhance your experience.