ArrowWolf1984 said:I hope they don't make us wear 3D glasses.
Austin said:Ok so I just thought of something. As it stands, the bbw queue is not nearly big enough for the crowds this coaster will draw. I mean look at Griffon, its queue is huge and I dont really see any way to expand it but to build up. Since the 55 ft tall bridge will go in the section right before the coaster I think they are going to add a second story to the station. This would put it roughly the same height.
ArrowWolf1984 said:Austin said:Ok so I just thought of something. As it stands, the bbw queue is not nearly big enough for the crowds this coaster will draw. I mean look at Griffon, its queue is huge and I dont really see any way to expand it but to build up. Since the 55 ft tall bridge will go in the section right before the coaster I think they are going to add a second story to the station. This would put it roughly the same height.
I'm not sure how they would be able to add a second floor to the Wolf's station without completely remodeling it or demolishing it. (Which they better not! :dodgy![]()
spencer said:I dont even know what the themed bridge is?:huh:
Austin said:ArrowWolf1984 said:Austin said:Ok so I just thought of something. As it stands, the bbw queue is not nearly big enough for the crowds this coaster will draw. I mean look at Griffon, its queue is huge and I dont really see any way to expand it but to build up. Since the 55 ft tall bridge will go in the section right before the coaster I think they are going to add a second story to the station. This would put it roughly the same height.
I'm not sure how they would be able to add a second floor to the Wolf's station without completely remodeling it or demolishing it. (Which they better not! :dodgy![]()
Yea me eithee but they will have to add space somewhere.
spencer said:I dont even know what the themed bridge is?:huh:
waross said:I did hear a rumor that the theme of the ride is a mysterious fog chasing Ludwig Von Beethoven through the Black Forest in his new BMW E89 while "wolfing down" some pretzels and Spaten Dunkel.
ivybrit said:E89=ewww
When do you think they will start site work?
Balak95 said:later part of this season id say end of july or early august if not sooner like june because it will take a long time to errect a coaster.
We use essential cookies to make this site work, and optional cookies to enhance your experience.