RE: Replacement Project For Big Bad Wolf
The build of the rides that will need to be moved of the rides if fairly strait forward. At the most the prep them for a different location will be leveling of ground/foundation/electrical, etc. A drop tower is FAST build, unless it is a Tower of Terror which I highly doubt.
gr8mat said:but the way i look at it this ride will more than likely be crap because most good rides will take about a season or so to build test run and fix all the errors. all they have done with the drop tower is put markers on the ground to show where things r going to go. and if they have to move rides around dont you think they would have already done it because that will take a while to do also. so if theyre going to move the swings and katapult. that will take a couple weeks or so plus then then have to level the ground run all the electrical stuff that has to go underground. and has there even been the frist sight as to construction materials on scene
The build of the rides that will need to be moved of the rides if fairly strait forward. At the most the prep them for a different location will be leveling of ground/foundation/electrical, etc. A drop tower is FAST build, unless it is a Tower of Terror which I highly doubt.