All around the park today, they are playing almost everything I have on my Halloween playlist. Not the usual hamlet music. I could understand the music change later in the day but I prefer the regular music.
It definitely won’t be the entire park for Christmas sadly maybe for the 2021 season. We shall seeHaving gone in September, I think you can really feel the bottlenecks with the current hamlets open. Hopefully for Christmas they can have the entire park open even if not everything is staffed.
The screening and bag check are in the England lot and then you walk to the main entrance.
It definitely won’t be the entire park for Christmas sadly maybe for the 2021 season. We shall see
For M Sweets, is it fully stocked or is the selection smaller than usual?
I don't know if fully stocked is how I'd describe it, but they had lots of varieties of donuts and tray sweets.
Having gone in September, I think you can really feel the bottlenecks with the current hamlets open. Hopefully for Christmas they can have the entire park open even if not everything is staffed.
I wouldn't be so sure about that. I definitely wouldn't be so pessimistic about the whole park being open in 2021. From what I'm told if the cap was even a little bit higher they would open the entire loop.It definitely won’t be the entire park for Christmas sadly maybe for the 2021 season. We shall see
Yeah, especially with them hiring more area hosts/ride ops it would seem that they would be able to staff the whole park. All they really need is a slight increase in the amount of people allowed inExpect basically the same area as September. With the addition of the Festhaus and the area around it. Everything else will largely be the same.
I wouldn't be so sure about that. I definitely wouldn't be so pessimistic about the whole park being open in 2021. From what I'm told if the cap was even a little bit higher they would open the entire loop.
Just got brought in a few days ago actuallyI haven’t been in a few weeks, but tonight was the first time I had seen the ride photo counters manned. How long has that been going on? I wonder if it means they have determined that they can afford to bring in more staff.
It's just a business decision, they just don't make enough money to staff the entire park. That would change with a higher capacity.Yeah, especially with them hiring more area hosts/ride ops it would seem that they would be able to staff the whole park. All they really need is a slight increase in the amount of people allowed in
We use essential cookies to make this site work, and optional cookies to enhance your experience.