Site plan failed review, comments seem like nothing more the small details that need to be added to the drawings in Regards to lighting and maybe one or two details to be re engineered regarding ground work stuff. If last time to this time was anything to go off this will delay any new progress for 52 days. I assume if JCC is anything like my locality they get 60 days they like to take 60 days.
 
Last edited:
Just based on the colors alone, I feel that combo would be more likely to end up at BGW than KD... ESPECIALLY if they're really doing the whole Big Bad Wolf tribute thing. Red & dark grey doesn't feel Jungle X to me.

Timelines do line up though, many examples of B&M track being painted & ready to be delivered a year before the ride's opening, this would be no exception if it's either of Virginia's projects.
 
I was just wondering because KD has already set up a lay down yard to receive structure, and bgw doesn’t appear to have even broken ground. It was said over in the KD forum that the track had not been spotted yet and you would think it should be produced relatively soon?

Also I dont think anyone knows what color i305 will end up post retheme.

Plus does b&m have any other active projects ?
 
  • Like
Reactions: Mwe BGW
The point where the crossties connects to the box spine is curved on the red track, meaning it’s some kind of inverted / suspended coaster. The crossties on B&Ms where the train rides above the track are typically straight / triangular in that spot. You can see that design on the grey and unpainted track sections in front of the red track. So you’ve got two or more projects worth of track there.
Some guy on the Reddit post commented this. I wonder if the gray primed track be the KD wing, and the red track is the BGW family invert?
 
I was just wondering because KD has already set up a lay down yard to receive structure, and bgw doesn’t appear to have even broken ground.
I wouldn’t personally put too much stock into what has/hasn’t been done.

In KDs case they are taking care of footers while Jungle X is closed, and when Jungle X opens, they’ll have to halt on all guest facing operations to do anything there. So likely they won’t be doing that part until Christmas time.

For BGW they could be looking to start further away and work themselves inside the train loop, which will likely have to cease operations a little, meaning theoretically they could do terraforming, footers, track install much closer together.
 
  • Like
Reactions: Mwe BGW
On further investigation, that Reddit comment is 100% accurate, the suspended track (invert, flyer) does in fact have that curved connection point at the spine. Can’t believe I’ve never noticed that.

Phoenix Rising:
View attachment 32187
Wolf..?
View attachment 32188

This just got a lot more interesting!
Photography Picture GIF
 
Is anyone else surprised by the lack of construction progress made for this new ride. It's now almost may and there is no movements made yet to start building this thing besides the fact that all the howl-o-scream props have been removed from the nevermore house. Aka drachen fyre station. And Witch Of the Woods has also been cleared out. Surely a project of this size would have needed to start by now. And we all know how inspections have been going for the park. And it's also almost hurricane season. Like let's hear your best guesses as to when this thing will be opening. Because if they don't start soon. It might as well say opening in 2026.

1000016864.jpg also to add as to how we know nevermore has been cleared out. As you ride the train you can see straight through the building now.
 
Last edited by a moderator: