Doesn’t BGW and most other parks use a 1/4 system? Only 1/4th of the train can be loaded with QQ folks. I thought this was how it worked at the park. I know Cedar Fair uses the system.
Ratios at BGW are typically far less than 1/4th, but if QQ lines get particularly long, the park will occasionally dedicate an entire dispatch to QuickQueue in order to moderate the QQ wait.