"So I got bad news today about the project so I guess I will talk about what I know to be true. The schedule, this is the tentative schedule that was issued;
The sfx building (building 80) foundation 5/31/11, floor slab 6/16/11, building erection 10/25/11 so we have to wait until Hollowscream to see the building. This building is slam full of stuff, lights, sounds, effects.
The station; selective demo 6/28/11, station reconstruction 9/7/11, theming 11/30/11. The theming is really nice.
The ride; ride fabrication 5/2/11, (where does Zierer build their track? Zierer is the manufacturer) deliver event building track 9/26/11, ride install inside sfx building 9/27/11, deliver remaining track 11/1/11, ride install outside 11/2/11, deliver 1st train 12/15/11, deliver remaining trains 1/16/12, startup and test 2/9/12. The schedule is very aggressive and the intent is to have the ride ready for opening day.
I've heard a couple numbers for the budget, lowest 51 million highest 54 million. We may never know the exact number but it is a huge amount.
I don't think the name is Elementum or Verbolten. I think they've kept the name totally secret, only a few people actually know it. I don't think they are flip flopping on the name like Cheetah hunt, the theming is too specific. The theming is great and I have a few ideas to the story but they are only guesses from what I've seen. They kept the actual theming details pretty vague.
I've seen a lot of the details to this ride and I think it will be really great, not the ultimate thrill ride but something really special and totally different."
Zierer produces track here:
ZIERER Karussell- und
Spezialmaschinenbau GmbH
Moosgasse 4
94560 Offenberg
Phone: +49(0)991 9106-0
Fax: +49(0)991 9106-84
Zoomy posted this in the old thread. It should live here as well:
"So I got bad news today about the project so I guess I will talk about what I know to be true. The schedule, this is the tentative schedule that was issued;
The sfx building (building 80) foundation 5/31/11, floor slab 6/16/11, building erection 10/25/11 so we have to wait until Hollowscream to see the building. This building is slam full of stuff, lights, sounds, effects.
The station; selective demo 6/28/11, station reconstruction 9/7/11, theming 11/30/11. The theming is really nice.
The ride; ride fabrication 5/2/11, (where does Zierer build their track? Zierer is the manufacturer) deliver event building track 9/26/11, ride install inside sfx building 9/27/11, deliver remaining track 11/1/11, ride install outside 11/2/11, deliver 1st train 12/15/11, deliver remaining trains 1/16/12, startup and test 2/9/12. The schedule is very aggressive and the intent is to have the ride ready for opening day.
I've heard a couple numbers for the budget, lowest 51 million highest 54 million. We may never know the exact number but it is a huge amount.
I don't think the name is Elementum or Verbolten. I think they've kept the name totally secret, only a few people actually know it. I don't think they are flip flopping on the name like Cheetah hunt, the theming is too specific. The theming is great and I have a few ideas to the story but they are only guesses from what I've seen. They kept the actual theming details pretty vague.
I've seen a lot of the details to this ride and I think it will be really great, not the ultimate thrill ride but something really special and totally different."