Man... I don't wanna think about Nessie's ultimate demise. This year's already sad enough, can we push that conversation to, like, 2023?
Given that they just invested in new trains, new paint and other services on her 3 years ago I don't think it would be right away as they will want to get something out of that investment but I could very well see that assuming nothing changes ridership wise or maintenance wise that 50 is a good run and that it's time for something else.Man... I don't wanna think about Nessie's ultimate demise. This year's already sad enough, can we push that conversation to, like, 2023?
Honestly and I hate to say this but it would not surprise me in the least given the lack of draw even with limited rides if Nessie only gets a few more years. I could very well see the park pulling the plug in another 7 years when she hits 50.
How dare you all. Nessie doesn't deserve to be talked about like that. She's an icon and shouldn't go anywhere. If anything they should shut her down for a season and have someone do a little refurbishment on her.I could see this as well. It’s taking up valuable real estate that the park could want to drive more value out of.
There are plenty of ways it could be replaced appropriately with a more exciting ride, while keeping the original theme and iconic loops.
And that's why I think that the plans to build two large coasters in 2 years is not something they're doing just to build up the park, but that they really take removing Ness as a serious issue. Even then, whenever it happens, it will be more a sentimental loss as I really think its replacement will be a fitting tribute or even very similar, but better. It seems like it could keep going forever, but I have trouble believing it will make it past 50 years. There are some parks that now have completely retracked and rebuilt coasters so that is possible, but they are running out of room for new coasters.LNM goes... when BGW goes... or vice versa. They are fatefully interconnected in that way. Nessie IS Busch Gardens.
If anything I would hope the park would decide to go with a rebuild like Python from Efteling where most of the supports are left and just new modern precision bent track is installed. IF they do go this route I would love if they did make some changes to the section after the helix -> the second loop. IMHO the jump up before the 2nd lift hill is the worst part of the ride. If they could figure out a way to remove that and the 2nd lift hill and do something interesting with that section I think it would make a huge improvement while still keeping the overall ride the same
theres a difference between character and outright pain , which that jump coming out of the cave is definitely the latter. I honestly dont even know why it is there. The only reason i can imagine is the lift hills couldnt handle the trains approaching at too high of a speed so that jump is there to reduce momentum a bit before the train engages the train?But I think those things are what gives it character that you just can't find in modern rides.
theres a difference between character and outright pain , which that jump coming out of the cave is definitely the latter. I honestly dont even know why it is there. The only reason i can imagine is the lift hills couldnt handle the trains approaching at too high of a speed so that jump is there to reduce momentum a bit before the train engages the train?
I dont think you would see a parts issue cause closure of LNM. More likely corrosion, metal fatigue, or some kind of foundational issue such as soil erosion where its a big cost repair and the ROI doesnt make any sense compared to putting in a new ride.That's the thing though - Volcano died partly because it was a prototype that never really caught on so there just wasn't any parts readily available from the manufacturer.
Arrow itself may be gone, but with so many of their rides still in operation, there's a good chance parts for most of their rides will be available to some degree for quite a while. Also, because a few manufacturers have lineage to Arrow, there's also a chance for complete refurbs on the older rides.
In Nessie's case, not only is it a common Arrow model even if the layout is custom so there's still parts being made (folks here have been claiming there's even some being produced up 64 in Richmond), but there's at least 2-3 manufacturers out there that could bid on any refurbishment contracts that would come up.
Now that said, I'd venture to guess that there will ultimately be an end of service life... May it not happen for decades to come.
I dont think you would see a parts issue cause closure of LNM. More likely corrosion, metal fatigue, or some kind of foundational issue such as soil erosion where its a big cost repair and the ROI doesnt make any sense compared to putting in a new ride.
It’s taking up valuable real estate that the park could want to drive more value out of.
I was referring to the area of Scotland and driving more foot traffic there in general. A more popular attraction than LNM allows for greater sales for food and gift shops.Is this really true, though? Nessie is unique in that the layout is spread out across a lot of different areas of the park, but it doesn't take up much space in any one area. Unless the park wanted to build a new coaster with basically the exact same layout, I don't see the land the ride takes up being very valuable. It's divided into the following small parcels:
- A narrow strip in Scotland where the queue, station, maintenance area, and lift hill are. You couldn't really put anything else here.
- The turnaround over Land of the Dragons. Using this land for anything other than a brief turnaround like Nessie has would also require removing LotD.
- The area including the MCBR, tunnel, second lift, and turn towards the second loop. This is the largest single area Nessie takes up, but it's sandwiched between Pompeii, the Rhine, and the pipeline.
You could possibly squeeze a flat or two into some of those areas, but because of how spread out the layout is, I don't see any one area being particularly valuable to the park to justify removing the ride for space. If Nessie goes, I'm sure it would be because of some difficulty with operating the ride anymore.
We use essential cookies to make this site work, and optional cookies to enhance your experience.