RE: Project 2018: Rebirth of Hurler
What I saw today was missing supports, a big hole, between the top of the 2nd and 3rd hills (fairly sure) of the backstretch, and another hole between the exit of the turn going through the structure down to the entrance of the final turn, which has track removed from the supports, the higher curve does not yet. With parallel sections removed, the path could do a cross, but then it would need another change to match. More likely, a larger hill will go between the 2 hill crests (double-up and double-down would be nice), or an inversion. Perhaps the inversion on the inner spot.
What I saw today was missing supports, a big hole, between the top of the 2nd and 3rd hills (fairly sure) of the backstretch, and another hole between the exit of the turn going through the structure down to the entrance of the final turn, which has track removed from the supports, the higher curve does not yet. With parallel sections removed, the path could do a cross, but then it would need another change to match. More likely, a larger hill will go between the 2 hill crests (double-up and double-down would be nice), or an inversion. Perhaps the inversion on the inner spot.