Register or Login to Hide This Ad for Free!
Official website says it's a continuation of the original and makes some reference to a castle tour...?


Hopefully BGW actually understands the original story they're paying tribute to this time around... *glares at DarKoaster*

Also very curious if anyone can make out what's going on at the bottom of the poster...

View attachment 44150
The thing at the bottom reminds me of a cylinder from a music box.
 
Looks like bottle caps on the sides?
vintage-music-box-mechanism-metal-prongs-and-cylinders-W3FEYJ.jpg antique-music-box-mechanism-exposed-luxurious-disassembled-view-gears-pinned-cylinder-against...webp

I think it's a weird AI version of the gears on the sides. May we possibly be traveling in a music box instead of a cigar (?) box?

EDIT: Picking out obvious call backs on the poster, seems like Fairies will be back, as well as Archibald and the witch in the castle. Also, the art on the poster reminds me of the animation in Into the Spider-verse/Puss in Boots.
 
Last edited:
Last edited:
This is so cool! I did get to experience the original when it was still operating, but this should be a really good alternative if it's done very well. But it's also great to have that building house an indoor attraction again after all these years.
 
Last edited:
Definitely not. Looks screen-based. Oh well
My understanding is it's screen based but much more immersion then anything we have seen in local parks.
So is this just another flight simulator? Not a dark ride...not like a flying theater? I them the original one.
I was told to expect in to be more of a 4D experience with interactive physical elements an less like a traditional sim ride
The Dynamic Motion Stage can have a wraparound video screen. Efteling's installation happens to use all physical sets, but that is not a design requirement.
https://www.intamin.com/wp-content/uploads/2022/10/Dynamic-Motion-Stage-Intamin.pdf
View attachment 44153
I doubt the park is going with anything from Intamin any time in thd near future.
 
My understanding is it's screen based but much more immersion then anything we have seen in local parks.

I was told to expect in to be more of a 4D experience with interactive physical elements an less like a traditional sim ride

I doubt the park is going with anything from Intamin any time in thd near future.

Can you elaborate more on why not Intamin? Just trying to narrow down some possibilities. Because if a first-in-America ride system, then that means it exists in full form out there somewhere.
 
Intamin was an issue under Larry Giles, though the park bought two water rides and condemned them based on their performance and didn't look at their flats or coasters afaik.

Is Falcons Treehouse involved?
 
  • Like
Reactions: Mwe BGW
It exists somewhere.
I shall find it.

EDIT: How about:

Chasseurs de Tornades aka Tornado Chasers at Futuroscope​

Chasseurs de Tornades

The ride is called Chasseurs de Tornades, or Tornado Chasers, at Futuroscope in France. It opened in 2022 and was the world’s first Dynamic Motion Theater, supplied by Dynamic Attractions.

This fits Horseboy’s description almost word for word.

What the ride actually does​

Guests sit on one enormous circular theater platform holding up to 120 riders. The complete platform:
  • rotates continuously in either direction;
  • tilts and rolls;
  • rises and falls;
  • can accelerate to roughly 27–30 km/h;
  • is surrounded by a gigantic 360-degree LED screen;
  • stops at physical openings where live actors and real scenery appear;
  • uses wind, rain, smoke, lighting, sound, and other practical effects.

That is not merely a simulator with a better screen. It alternates between media and real theatrical action, with sections of the surrounding screen opening to expose live physical scenes. Dynamic Attractions specifically described the system as a rotating theater surrounded by a screen that opens at key moments for live action.

Compare that directly with Horseboy’s wording:

“More of a 4D experience with interactive physical elements and less like a traditional sim ride.”

That is an exceptionally close description of the Dynamic Motion Theater format.

Why it could support Corkscrew Hill​

Imagine the same system with the tornado theme removed:
  • The platform rotates toward a physical witch’s laboratory.
  • A section of the screen opens and reveals a practical giant or animatronic.
  • The platform turns and the surrounding screen becomes the Irish countryside.
  • Wind and motion simulate being carried through the forest.
  • A dragon appears through media, physical scenery, or both.
  • The riders descend or tilt while practical branches, mist, lighting, and scenery move around them.
That would let Busch recreate the original movie’s flights while also adding the physical characters and environments Horseboy mentioned.

It would feel like Corkscrew Hill physically materializing around the audience, rather than everyone simply watching a remake on one front-facing screen.

Would it fit the old simulator building?​

This is the biggest question—but the dimensions are more plausible than I expected.

The installed French version uses:
  • an approximately 11-meter/36-foot moving platform;
  • a roughly 17-meter/56-foot-diameter auditorium;
  • a surrounding LED environment of approximately 5,000 square feet.
The Williamsburg building previously housed two substantial simulator theaters. Busch would almost certainly have to gut the interior, remove the original platforms, and potentially combine the former theater bays. But a 56-foot circular room is far more plausible inside that footprint than an Intamin Ultra Tower requiring something approaching a 100-foot shaft.

The Dynamic Motion Theater would require:
  • a large circular clear-span show room;
  • a reinforced or newly excavated central foundation;
  • space beneath the platform for motion equipment;
  • a roughly 36-foot moving audience platform;
  • a surrounding structure approximately 56 feet across;
  • room outside that circle for physical show scenes and maintenance access.
I cannot verify the building’s internal dimensions from a public architectural drawing, so I cannot prove it fits. But based on the fact that the structure housed two large simulator bays, it is physically credible if Busch removes the dividing structures and performs a full interior rebuild.

Building-fit score: 8/10

The main uncertainties are roof height, column placement, and whether the combined theater space provides a sufficiently wide clear span.
 
Last edited:
Just like how an all new system was "Snowmobiles" versus "Jet-skis" with Darkastle.
No the basic ride platform exist somewhere in the world but what BGW is getting will almost certainly be vastly different then the one that exists and not just cosmeticly
Can you elaborate more on why not Intamin? Just trying to narrow down some possibilities. Because if a first-in-America ride system, then that means it exists in full form out there somewhere.
Intamin was an issue under Larry Giles, though the park bought two water rides and condemned them based on their performance and didn't look at their flats or coasters afaik.

Is Falcons Treehouse involved?
I will answer both at the same. Intamin was black listed for a long time from BGW after having major issues with Escape from Pompeii that vastly expanded the cost. After SEA saw success with Cheetah Hunt and other attractions BGW lifted that ban. They have since had najor issues with every Intamin project including some very concerning ones. I find it highly unlikely that we will see them used anytime soon.

An no Falcons Treehouse is not involved in this at least to the best of my knowledge.
 
Bummer - those were the preferred story team the park hired iirc.

As for the Intamin issues - what manufacturer-caused ride system issues are they having problems with that aren't because of either the park trying to save money on maintenance (not having parts available when the inevitable breakdown occurs), or because the park's ride design and development requirements forced the manufacturer to build something innovative that also came with a huge risk of not being super reliable due to it not being a more commonly used solution?

Though, that said, the Dynamic Attractions concept seems more plausible for this dark ride anyways - I just hope if they go that route that there aren't major maintenance headaches or rare parts or general reliability issues that come with it.
 
Consider Donating to Hide This Ad