Capacity was also a massive issue with VR. I only did Skull Mountain and Zumanjaro (not a coaster, but still), and Skull Mountain already gets long wait times but I was not a fan of waiting 2 hours for it. VR was also the only time I ever saw more than a 20 min wait for Zumanjaro, granted it was probably only about 30 mins and doing it on the most remote, low ridership attraction in the park was probably intentional, but doing it while it was already struggling with capacity due to NJ blocking it from operating simultaneously with Kingda Ka was certainly a choice.