green to try and be like jungle canopy, maybe? Or green plumage? Unsure yet.

And, unfortunately, I don't see a spot to put in double-sided lockers (like TT) in the drawings. I would assume the building will house exit/photo/giftshop, possibly paid lockers.
 
We don’t, but if it’s true that someone spotted green track with stators, it increases the likelihood it’s for KD.
 
Random “dumb” question:
The launch elements having theme to them. Does anyone know if they’ll build the building first, footers being part of the buildings foundation, then install track into the space; or will the footers and track go first then the building gets put up around that.

I can think of a ton of reasons to do it both ways but can’t really figure out which way is likely.
 
Random “dumb” question:
The launch elements having theme to them. Does anyone know if they’ll build the building first, footers being part of the buildings foundation, then install track into the space; or will the footers and track go first then the building gets put up around that.

I can think of a ton of reasons to do it both ways but can’t really figure out which way is likely.
It’s not one or then the other type of thing it’s almost certainly at the same time. There is always a very very very very small chance they will but something later on because engineers are the most unpredictable creatures to walk to earth. But most likely you would not want to start a second project and dig a second set of footers right next recently established footers. They might build a structure after track installation but would should see foundations go in at the same time.
 
It’s not one or then the other type of thing it’s almost certainly at the same time. There is always a very very very very small chance they will but something later on because engineers are the most unpredictable creatures to walk to earth. But most likely you would not want to start a second project and dig a second set of footers right next recently established footers. They might build a structure after track installation but would should see foundations go in at the same time.
I was just trying to think of a reason why track isn’t showing up. If they needed to build a bunch of the structure before bringing in the track for the launch area it makes sense that they need more time to build that in.
 