My understanding is that when a ride is turned over to the park the ops do everything they can to force faults such as hitting all the buttons on the control panel at once, etc. Is that even close to correct?
That's usually during the programming time. Usually the programmer will run the ride alone until 2 train ops, then have park ops come and operate the ride. This is when they do anything they can to cause a fault, valley, or otherwise break the system. This reduces downtime after opening.My understanding is that when a ride is turned over to the park the ops do everything they can to force faults such as hitting all the buttons on the control panel at once, etc. Is that even close to correct?
All part of the International Amusement Installers experience?Downtime after opening is a signature Intamin feature, though.
My understanding is that when a ride is turned over to the park the ops do everything they can to force faults such as hitting all the buttons on the control panel at once, etc. Is that even close to correct?
Brian has mentioned this to me multiple timesIf I can find the comment, I'll link it, but on Irvine Ondrey Engineering they mentioned that they get frustrated when higher ups wish to ride before they have the ride dialed in.
My understanding is that when a ride is turned over to the park the ops do everything they can to force faults such as hitting all the buttons on the control panel at once, etc. Is that even close to correct?
I'm not going to say all the details, but a ride that I helped commission, I was talking with the engineer from the manufacturer. Basically, he wanted me to "break the ride." We pressed every button there was and then he basically told me to kick the operator gate with the ride in motion to see if it engaged the e-stop. Needless to say, I kicked the gate open and the ride did NOT e-stop. So we hit the e-stop. But the programmer got frustrated at us because he "disabled" that safety feature for testing purposes (they hadn't handed the ride over to operations yet). After that, the gate sensor was enabled again because there was basically no reason for it to be disabled at that point in testing.
But I'm sure the programmers have ridden the ride already like ControlsEE mentioned. They get to ride before anyone else. If I can find the comment, I'll link it, but on Irvine Ondrey Engineering they mentioned that they get frustrated when higher ups wish to ride before they have the ride dialed in.
"OP1 Ride start is stucked." That was a legit fault at Volcano. If you held down any button at board for more than 60 seconds the ride would fault out and require a maintenance reset. Always a fun one to explain to 690.
I remember being able to pull a restraint all the way up during a ride commissioning, the board was still registering it as down. One of the Park Managers had literally just gotten off from a test ride in that exact same seat too. I'll never forget that look on his face.
??????????
We use essential cookies to make this site work, and optional cookies to enhance your experience.