Register or Login to Hide This Ad for Free!
Thomas said:
It looked like the base of the first drop is pretty much done. Lots of work was going on in the entrance plaza too.

The base and tunnel portion for the first drop is pretty close to being done. They've started working on ramps for the entry plaza to the station as well as some posts have gone up, not sure if they're for lighting or path coverings/awnings. Based on the theme, I would assume lighting.
 
I'm going in on BGW Family with this one, here's one as of Tuesday. Looks like they're starting to go more into structure with some infrastructure (phone, electrics, etc) The workers were not amused with me taking their picture XP
 

Attachments

  • IMG_2235.jpg
    IMG_2235.jpg
    3.2 MB · Views: 95
  • Like
Reactions: jornor
Jcoaster said:
Hey guys, long time reader first time poster here on the site. Any word when more fan voting will be taking place for InvadR?

I'm not so sure, maybe they will, maybe they won't. The big voting process came early this year when deciding the official name of the new wooden coaster.
 
  • Like
Reactions: jornor
Jcoaster said:
Yea, I'm hoping for some "Cobra's Curse" style theming. Maybe a Viking Ship of sorts interacting with the layout.

I don't believe this coaster set up for something like that as interesting as that would be.
 
Yay found a Viking pusheen!

large.gif
 
Kyle said:
Looks like InvadR is gearing up for night construction this evening. They were draining Le Scoot and lights all around the construction site (mainly station/queue area) were going up.

Well having a water ride down in the middle of a hot summer isn't the best thing to do so it would make sense they'd do whatever work they can at night to minimize Le Scoot's downtime.
 
  • Like
Reactions: jornor and Jcoaster
Consider Donating to Hide This Ad