Maybe this is a nitpick, maybe this isn't. I'm also not 100% sure on this as SEAS is constantly changing the rules. It is my understanding that the path to Pipeline from the park's entrance will remain the same as it is now, with some additional path closures as well. These closures are meant to drive traffic into the park's gift shops afaik. Consider this the ultimate version of being forced through a gift shop at a ride exit. Now to get to a ride, existing paths will be (or remain) closed to force you past the majority of the park's shops any time you wish to get to and from the parks major attractions.
I have included a crudely drawn image of the pathway closures, the routes that are being blocked, as well as the anticipated shortest route to Pipeline. If this is correct, despite being right next to the entrance with an existing pathway leading directly to it, Pipline will be the longest walk from the entrance.
View attachment 28599