can we get a birds eye view of all of this? I want to see how you managed to make this all workI'll raise you one, no AI necessary:
View attachment 44921
(ft. new colors for Superman)
View attachment 44922
Here's the overview. Very unofficial but the obvious modifications required to pull this off would be:can we get a birds eye view of all of this? I want to see how you managed to make this all work
Here's the overview. Very unofficial but the obvious modifications required to pull this off would be:
Possible? I think so.
- Redo the outerbank entirely, making the overall angle (viewed from top-down) more gradual and not a full 90* angle
- Adds a speed hill between the outward bank & double-up for spacing reasons
- Allows the turnaround to thread underneath Bakunawa
- Feasibility of this is entirely unknown, I would personally not count on accuracy here.
- Widen the jump into the final brakes
- Extend the final brake run, allowing for a block brake before the transfer track (for operational reasons)
- This version also widens the valley for the first drop and following speed hill (before the stall) so that it's closer to ground-level
- I don't think this would be required, I just wondered what it looked like, then finalized the design, and don't want to revert it lol.
View attachment 44932
View attachment 44933
View attachment 44934
from my understanding it needs to be off alanta site before jan. so once when it does start coming down it will probably be heading straight to the location they plan to install it atJust seeing how it could work in this spot. I do think Great Adventure is probably in the top-3-most-likely parks in the chain to receive it (Carowinds and Kings Island being the other two), but even that's just a guess. Apparently the location will be announced by end of year?
I have sence seen more pics and even video it appears legit that it's removal has started. Carowinds, Kings Island, and Great Adventure seem like the three most likely parks. Part of my thinks it's likely between Carowinds and Great Adventure as moving it to Kings Island with Steel Vengeance at Cedar Point seems like an interesting idea.from my understanding it needs to be off alanta site before jan. so once when it does start coming down it will probably be heading straight to the location they plan to install it at
for me king island is probably my least favorite choice due to the terrain by orion and i feel like the park can do so much better with a custom rmc. carowinds would be my favorite since it will be still the southern heat so the ride can run as quickly as it did in alanta.I have sence seen more pics and even video it appears legit that it's removal has started. Carowinds, Kings Island, and Great Adventure seem like the three most likely parks. Part of my thinks it's likely between Carowinds and Great Adventure as moving it to Kings Island with Steel Vengeance at Cedar Point seems like an interesting idea.
A lot of that comes down to local zoning laws BGW for instance has a realy long approval battle because of the height restriction and noise restriction with Kings Mill being so close great Adventure likely has far fewer hoops to jump through given it's more remote location. In short Six Flags likely knows where it could be approved without much of a battle. Also I wouldn't rule out the possibility that if the January deadline is correct that they do something like store it at Over Georgia till they mske a final call. Or while a more remote chance that if a reprofile or rework is planned that part or all of the track atleast goes back to RMC for the time being.No way a park wouldn't have submitted permits by now. I mean, they're not gonna start shipping it somewhere if it's not approved by the county; that would just risk a giant waste of money, even if they're super confident. And let's be real, Six Flags probably knew where this thing was going since day 1...
i mean with the history six flags has shipped rides to parks that fall through.siren curse at mexico and a bunch of other examples from old era six flags. i do think the crane is just to remove the trains and probably send them to sfog for maintence and inspectionsNo way a park wouldn't have submitted permits by now. I mean, they're not gonna start shipping it somewhere if it's not approved by the county; that would just risk a giant waste of money, even if they're super confident. And let's be real, Six Flags probably knew where this thing was going since day 1...
Large coaster track/support sections that exceed normal trucking dimensions can’t just be thrown on a trailer and driven wherever they want.
But I still think @Zachary is gonna be the first, cause he’s always been the best.
We use essential cookies to make this site work, and optional cookies to enhance your experience.