Could be a work flow thing. Making bents takes time and if you have the erection crew waiting around you might as well use themI'm sightly amazed that they are installing track at it appears there's quite a bit of wood to be added still. I'm not just saying that based on the footers never I'm sure that there are a lot that won't be used. But it looks like they built tunnels into some if the structures but there's nothing built in either side of them yet. Then there's the entire lift hill structure and connecting the various structures together. Just seems like there's a significant amount of work left
With that most of the bents were made off site I think. I know one of the (former) interns that bolted them together.Both of those explanations make sense. The only wooden coaster I have an experience with the building process is Invade and that obviously was a different process.
Could be a work flow thing. Making bents takes time and if you have the erection crew waiting around you might as well use them
We use essential cookies to make this site work, and optional cookies to enhance your experience.