Are there any updates here? It's July and definitely the full-swing of summer, we should be getting close to "Summer 2026" now, right? Have they poured midways, or built restaurants, bathrooms, back-of-house infrastructure? I guess I'm asking if this place looks like an actual park yet?
all the planned restrooms are built. Its still missing two restaurants and the hot lap building, unless those designs have changed.
midways are poured.. the property is getting a ton of plants and trees and general landscaping. I believe they are going to still open with a few fenced off areas pending construction. for instance. the Texas Porch Swing (Sky Blazer) has not begun construction yet. They have been testing the screamin swing along with the drop tower.
Honestly the property is looking great. There is so much attention to detail im actually blown away. They are putting more effort in than Universal Kids haha.
But on terms of opening.. I am thinking late August, which is still technically summer..