Register or Login to Hide This Ad for Free!
Park Status
Defunct
Location (US State)
Texas
In case anyone was considering it, COTAland’s Matt Hughey confirmed they looked into Switchback and passed on it. Too similar to Palindrome and didn’t really fit their vision;
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Direct Link to Embedded Media Source

(1:15:00)
 
Rumor has it Valleyfair is clearing land at the front of the park in a similar shape to this. Anyone want to sleuth and see if this lines up?
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Direct Link to Embedded Media Source
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.

Direct Link to Embedded Media Source
 
More fuel to the fire: https://www.reddit.com/r/rollercoasters/s/KyT0rFOgUS

Switchback is not a good fit at VF. Sure it physically fits, but the whole ~200pph thing would be a huge problem.
Maybe I'm wrong but I remember hearing that ZDTs opted out of running two trains on this, but it was able to be modified to run that way in the future after a relocation? So at least it could get closer to the capacity of a flat ride, maybe double that figure and closer to what is more acceptable for a coaster that size?

Otherwise, I think this would be a capacity disaster for anything but a tiny park (and out of the price range of most small/indie parks).
 
Just to add some fuel to the fires of speculation. Switchback could fit in the plot of White Water Landing, and the height wouldnt be an issue theoretically due to Switchback being shorter in height than the existing ride.

*yes, this is wishful thinking on my part*
Screenshot 2026-09-04 101902.png
 
The capacity question got me curious so I dove in a little. Timing all the control points from a pov I'm getting roughly 48 seconds from the time a train is dispatched to the time it'd be permitted to exit the lift with 2 trains (10 seconds for station to be clear, 26 seconds for the next train to advance, 12 seconds for switch track to return to other position), when accounting for 48 seconds of lift time (vs. 36 on 1 train ops) that would bring the time from a train dispatching to parking on the breaks up to 1:54.
I believe that from that, 1:54 would likely be the minimum dispatch interval to avoid block checks. With 1:54 as a dispatch interval that's a little more than 31 trains or approximately 250 riders.
With one train ops the time from dispatch to parking in the station is 2:08. How quickly you can theoretically check a train is obviously highly variable, but looking at some kentucky flyer footage for reference I'm guessing 45 seconds would be the practical minimum with most cycles in the 1:15 range. Using 2:53 as the interval one train ops could optimistically achieve 20 dispatches or 160 riders.
For some reference, kings dominion racer & grizzly typically do 13 cycles running one train, which is 364-390 theoretical riders.

Side note, when thoosies time operations why does it always start when the gate opens, the number that actually matters is total time parked in station, getting people off the ride efficiently is just as important to operations as getting people on.
 
Last edited:
Consider Donating to Hide This Ad