Register or Login to Hide This Ad for Free!
Status
Not open for further replies.
RE: Verbolten

This is the track leading up to the bridge. Sorry I didn't take one further out, but it is actually pretty high up there.
 

Attachments

  • Coaster Crew\'s 2nd Holly Jolly Christmas 081.JPG
    Coaster Crew\'s 2nd Holly Jolly Christmas 081.JPG
    849.5 KB · Views: 161
  • Like
Reactions: Shafor and Zachary
RE: Verbolten

No... They reused bbw's footers so they don't have to do that... I have been to Christmastown twice and there is no sign of them draining sections

This is an update from a while ago proving this

www.bgwfans.com/?p=1415
 
RE: Verbolten

That looks like it's going to be a lot of fun with the elevated seating cars. I haven't ridden in elevated seating cars, but I'd imagine it to be somewhat like the seats on second generation B&M hypers. If it's anything like riding in one of those seats, that's going to be a lot of fun.
 
RE: Verbolten

evanthecoasterlover said:
Its going to interest me on how in the heck there going to get the track in over the lake.

Bridges get built all the time.
 
RE: Verbolten

I managed to get out and take some pictures for my site last night, my first visit to Christmastown this season, and my dad's first visit ever to Christmastown, and I have to say, this was the best ever yet and my dad was totally blown away. I have taken well over 100 pics of Verbolten, and did not manage to do the event building side since there isn't much to see over there and most of it has already been covered. Here are the pics:

bgw12172011001640x480.jpg


bgw12172011001740x480.jpg


bgw12172011002640x480.jpg


bgw12172011003640x480.jpg


bgw12172011004640x480.jpg


bgw12172011005640x480.jpg


bgw12172011006640x480.jpg


bgw12172011008640x480.jpg


Hope you enjoy the update I provided, please don't criticize the quality of my photos, I did not know what captions to use for the photos, so I'll let everyone else debate away.

-Brian
 
RE: Verbolten

Thanks for those pictures! They are amazing! I love the pic pf the little pre-drop out of the building into the second launch! Say, should I get some pictures when I go on the 26th guys?
 
RE: Verbolten

Looking good. Nice little pre-launch drop out of the building. Also, seems like track construction is almost done.
 
RE: Verbolten

Thank you guys for the positive feedback, I enjoyed sharing them with you guys! @trevorbondi If you can get there on the 26th, that would be awesome. I'm not able to get up there anymore this year, too much work coming in for the holidays.
 
RE: Verbolten

Do we know if a train is here yet? According to this ( www.bgwfans.com/forum/showthread.php?tid=1&pid=16150#pid16150 ) one train should be here already... I would assume that bg would post a video of their arrival like bgt did with cheetah hunt
 
RE: Verbolten

My family is going up there on the 26th in hopes of short lines! I will give you an update then. All I want to see there is a drop to the Rhine River. Hahahaha, but I don't think there will be THAT much progress in just 6 and 1/2 days.
 
RE: Verbolten

Well, they do have the mornings to work on the coaster! Being that it gets light at around 7am ish that gives them 8 hours every day! Also, is it just me, or does the track after the building look black...? Thought all of the outside track is grey?
 
Status
Not open for further replies.
Consider Donating to Hide This Ad