Highly doubt it, keywords are vertical and transfer. The inverted launch here isn't vertical, and the train isn't being transferred.
Edit: also, if it's a storage transfer track, is that just a selling point from the ride manufacturer to the park?
Edit: also, if it's a storage transfer track, is that just a selling point from the ride manufacturer to the park?
Last edited: