Well based on the scope line “Ride Station = 4,856 SF on two floors, Queue Building = 1,024 SF, Electrical Building = 739 SF, Tunnel Building = 2,179 SF” this encompasses basically everything but the parts from Vekoma. The “Tunnel Building” I assume means the show scene during the ride. So it being $5.5 million doesn’t seem too far fetched based on all the props, buildings and scenery in the announcement.