• And we're back! Everything should be in working order now. If you have any questions or issues, feel free to message the admins.
Register or Login to Hide This Ad for Free!
Well based on the scope line “Ride Station = 4,856 SF on two floors, Queue Building = 1,024 SF, Electrical Building = 739 SF, Tunnel Building = 2,179 SF” this encompasses basically everything but the parts from Vekoma. The “Tunnel Building” I assume means the show scene during the ride. So it being $5.5 million doesn’t seem too far fetched based on all the props, buildings and scenery in the announcement.
 
Consider Donating to Hide This Ad