Verbolten: The Bolt's Revenge
Honorable mentions also go to BöltSturm, BöltsReign, and GeisterBölt
Honorable mentions also go to BöltSturm, BöltsReign, and GeisterBölt
As lame as this sounds a new restroom building somewhere over here would be the bee's knees (especially if the park finally pulls the trigger on the smoking sections)It'd be nice to get a Mach Tower replacement alongside Verboltens renovation.
They’ve already converted part of that queue to a bar, why not covert the other half to a restroom?As lame as this sounds a new restroom building somewhere over here would be the bee's knees (especially if the park finally pulls the trigger on the smoking sections)
Leave Greta out of this!So long as they replace the pre-recorded spiel in the station with something that is less eardrum-piercing, I'm on board LOL.
Exactly! She may have her flaws but don’t touch her!Leave Greta out of this!
Verbol2: Electric BoogalooVerbol10
Or...
Verbol11
This shouldn’t be a “project”! Just keep the name, repair the damn thing (including the queue), and carry on.
Still two less than Th13teen.Verbol10
Or...
Verbol11
I'm liking this. I've mentioned my desire to have the layout extended, especially now that The Wolf's Revenge blocked off land and this is probably the only use (other than replacing this ride altogether with one whose layout extends into the dead space.blow holes in the building and have it do some outside loops around the berms/hills then just fly into the second launch![]()
We use essential cookies to make this site work, and optional cookies to enhance your experience.