Register or Login to Hide This Ad for Free!
Status
Not open for further replies.
Man from the top hat to the crest of the bank is very short, should make for some really good intensity to go from 90°+ to sideways in less than a second or two
 
It just looks so good. Our very own modern intamin launch coaster with a zero G stall and huge outward bank turn and ejector air right here in VA. Once busy season wraps up I am going to eat nothing but Chicken and salmon for months until that test seat says "good."
 
testing stopped for a while and has not resumed yet but there are more people moving around the site now so hopefully soon. On Wednesday the park maintenance staff was working with them quite a bit and I guessing they may have stopped while maintenance scrambled to get the park rides up when temps got high enough. Those rides are now starting to open so hopefully more testing soon.

One train they still have 2 train in the maintenance bay with no sign that it's been run. I have been told that we will see two train run alone for at least 1 solid day for checkout before seeing two train runs.
 
If we could see two trains at once, that would be dope.
I been pretty much told not till tomorrow at the earliest more like Monday given that they still haven't moved train two on to the tracks.
 
They were on the catwalk in the maintenance shed as I was leaving. They could be switching trains or 2 train testing soon.
 
Status
Not open for further replies.
Consider Donating to Hide This Ad