I, personally, wouldn't expect 2 train operations until a week or so after continuous full circuit testing (no stopping on swing launch). There is a lot more safety systems to test in the meantime.
It's worth noting that it did appear to be going faster through the swing launches to me and a few other people that were viewing it. Not sure that isn't an optical allusion from it not being E stopped but it looked fast up the top hat in particular.I decide to take a nap and I wake up to see the train going Mach 10 over the tophat. Goddamn
It’s definitely sped up. The back wheels on the train now reach above the track change on the spike. Plus the train is zoomin even faster over the tophat. Potential to be one of the best drops in at least the US.It's worth noting that it did appear to be going faster through the swing launches to me and a few other people that were viewing it. Not sure that isn't an optical allusion from it not being E stopped but it looked fast up the top hat in particular.
Maybe a little higher on the spike but not significantly more based on shots that I took last week.It’s definitely sped up. The back wheels on the train now reach above the track change on the spike. Plus the train is zoomin even faster over the tophat. Potential to be one of the best drops in at least the US.
Veloci crawls in most spots. There is a trim on Veloci's top hat which really slows it. Pantheon gets whipped overRemember the hype for Velocicoaster before testing? Then it tested and it’s slower than expected, but Pantheon is going faster than anyone thought. Looks like a real winner.
You’re stupid fast.That switch is stupid fast
Veloci crawls in most spots. There is a trim on Veloci's top hat which really slows it. Pantheon gets whipped over
We use essential cookies to make this site work, and optional cookies to enhance your experience.