Register or Login to Hide This Ad for Free!
Status
Not open for further replies.
If it's not a full send, do they have to winch or crane the train back to the station?

It looks like they are launching backwards at enough speed to get close to the station (but doesn't enter the station.) All while giving it enough speed to get a rolling start for the first launch.

EDIT: Twisted_Airtime beat me to it
 
  • Like
Reactions: Twisted_Airtime
Back in 2015 when Tempesto started testing it started out with only the first tower and built it's way up to a full send by the end on the day. I think we're looking at the same thing here.
 
  • Like
Reactions: Le Moose
Still sitting on the main launch no staff I'm site but it would be about the right time for a lunch break hopefully more soon.
 

Attachments

  • 20210320_142507.jpg
    20210320_142507.jpg
    2.4 MB · Views: 1
Status
Not open for further replies.
Consider Donating to Hide This Ad