Register or Login to Hide This Ad for Free!
Status
Not open for further replies.
Hey, the train station should be an option to sit at least. Wouldn't be a problem unless you needed a table. I doubt they will have Festa closed since I hope the bridge will be completed by preview day.
Good point, hadn’t thought about the train station but the only problem I see with that is again you won’t be able to see the entrance to the bridge. If it’s like Tempesto by the time you see people crossing the bridge and you scoot to the entrance they may have closed the line again.Also it was hot during Invadr and that train station area it’s always hot in the sun.
 
  • Like
Reactions: ControlsEE
Okay here's the plan.

We need a giant wooden horse; two Bobby pins and some duct tape.

We take the wooden horse and label it "Pantheon theming". We get inside it and get someone to drop it off by the employee entrance.

When they take it inside the park, we jump out, hotwire the control board and get to be the first to ride Pantheon.
 
Last edited:
bunny-catapult.gif
 
When they take it inside the park, we jump out, hotwire the control board and get to be the first to ride Pantheon.
Who needs to hotwire when you could hook up a laptop with an internet connection and let me run it remotely!

[Disclaimer] This is just a joke, and I hope that everyone sees that. While I do have the skills to do this, I wont and please do not attempt this.
 
Who needs to hotwire when you could hook up a laptop with an internet connection and let me run it remotely!

[Disclaimer] This is just a joke, and I hope that everyone sees that. While I do have the skills to do this, I wont and please do not attempt this.

Overclock the launches, go really really fast!
 
Okay here's the plan.

We need a giant wooden horse; two Bobby pins and some duct tape.

We take the wooden horse and label it "Pantheon theming". We get inside it and get someone to drop it off by the employee entrance.

When they take it inside the park, we jump out, hotwire the control board and get to be the first to ride Pantheon.
It won't work the park will be like we didn't plan any theming for it as nd just ignore the horse.
 
*looks up DO18 keys on Amazon*
I keep one on my keyring. I've run both Skyride and Catapult off of it before. Too bad BGW changes the default lock to either a rare or custom AB design for their coasters and major rides to prevent unauthorized use.
 
  • Like
Reactions: BGWnut
Or, if you are like me and have RSLogix5000, Just upload the project from the controller and bypass it in software.
 
This may be a dumb question, but on coasters with switch tracks what safety mechanisms do they have in place if the track malfunctions?
 
Status
Not open for further replies.
Consider Donating to Hide This Ad