Hey, if it worked for LNM it'll work for this one. ?The support is up here, I'd guess it didn't fit and they're resizing it.
Very true indeed, manufacturing plays a HUGE roll.These type of production problems are often not engineering's fault!
Do you think that this may slow down/delay the construction? I am planning to be there mid June, hope it's open by then.
I feel like the missing support thing happens on occasion from various manufacturers - could it be one of those things where it gets installed like that as a safety net for the manufacturer?
Thinking that even with a given company's experience and engineering to ensure a proper ride experience, they added connections for more supports in case more need to be added or they need to switch the force load to another point of the structure?
Remember when Tempesto had part of the non-inverting loop removed and then put back in place? It's normalThat support was guilt and installed before the track went in, so they must have taken it down. It is a reality of construction that not all pieces are perfect or work perfectly, but they still have engineering and manufacturing capability to correct the part.
I do partially wonder if the fit is fine but to get something into that area they had to remove the support for the time being. Anyone able to snap a pic of the ground around the support to see if maybe it was just placed there?
Frm the plans, it looks like it completely bypasses the station. It starts on the higher ground then. Maybe I'm wrong again
From March last year this shows what you're looking for. Scroll down to "Area".Frm the plans, it looks like it completely bypasses the station. It starts on the higher ground then. Maybe I'm wrong again
We use essential cookies to make this site work, and optional cookies to enhance your experience.