Register or Login to Hide This Ad for Free!
Eric said:
Well then there you go, no drones, just thought it was a cool idea.
I wish! That would be amazing.
large.gif
 
  • Like
Reactions: deacfan31 and Eric
I have no doubt they are in the process of creating a ban/policy. Think of a drone flying into a coaster's path...

ANYWAY - any more updates as of this weekend? Is the Wild Moose Lodge leveled yet?
 
I hope that they accept my John & Jane D. format submission. I figured it would be easier to pick out and of course, It'd be cool to have both names next to each other.
 
Not for a couple of months. Takes a lot of time to prep for that. Things like electric, plumbing, and other utilities have to be buried in their right place first. Along with grading the land.
 
This thread is so dead...on the train ride the other day they mentioned construction was going to start this summer and the ride is scheduled to open next summer. Do you guys think they actually meant next summer or do you think they meant late April/early May?
 
John said:
Mach Tower was slated for April 2011, but didn't open until that August.

Not a fair comparison. You had one company build a drop ride they had never made before and another company that is building a coaster that is much smaller than they are used to doing (and have been doing for the last 20 years). GCI has never had a problem delivering their coasters on time.
 
Consider Donating to Hide This Ad