Found on Instagram:
I find this unlikely because it says “exiting” instead of “existing”.
You mean original 4 waterslides at the park?SFAFans on FB which is usually reliable is saying that they believe it is for the already announced Zoomazon Falls removal.
The 4 that were at the end of the water park and went down hill toward the main park. haven't been going long enough to know if they are original.You mean original 4 waterslides at the park?
With that being said they still have yet to fix that "typo" on their site about the basic pass not allowing water park access.If this is a replacement for those four old, SBNO slides, it will be super interesting to see whether it's a dry park addition or a water park addition. It seems to be that a water park addition is more likely given the apparent intention to make the water park a separately ticketed park, but on the flip side of that coin, the location is far better suited for a dry park addition and everyone agrees that SFA is in desperate need of a marketable new dry park attraction.
It may not be a typo.With that being said they still have yet to fix that "typo" on their site about the basic pass not allowing water park access.
If its those slides next to the wavepool, could that be the separate gate for the Waterpark that is being rumored. Its right near the parking lot and they still have not edited the Season Pass language on the site to say the basic pass allows waterpark access.View attachment 28242
It is the drop slides which are exactly where he marked if my memory is correct. Also interesting cause they are relatively recent as I think there were installed about 8 or 9 years ago. I wonder if maybe the selection was made for tower reuse?It says new ride on both of the permits. Also I don't think that's where they are, but I'm not 100% sure.
Isn't Bonzai Pipeline one of the newer additions? I wonder if they discovered some kind of issue with it that caused them to decide to remove it.Per the Permit that SFA Fans found and posted on FB this morning Bonzai Pipeline is also bring removed. Make one wonder what they are planning especially since the permit mentions additional permit approvals needed for a new ride.