? I think that, any leaks are good leaks, so I took what I could get? Source looked at me with big brown eyes and said ? You ain’t seen nothin’ yet? Baby, you just ain’t seen n-n-n-nothin’ yet? Here’s something, here’s something, here’s a leak you’ll never forget? Baby, you just ain’t seen...bgwfans.com
I think what @Jahrules was saying is that they need to have the crane work done before the FAA waiver expires. Though they technically have until 1/17/2021 to do so apparently.. They did specify the work schedule to be through December or this year though initially.To be fair they don’t need to.
I think the rest of it will be done within two weeks. There's almost of of the layout left, but the layout is so short that it could realistically be done in that time frame. I think they mainly wanted to get the bridge and at least get a start on the station before finishing the layout.Side note: they really need to get a move-on on this construction.
We saw a seemingly impossible speed at first which has almost predictably slowed the past few weeks.
But now it's December and their crane permit is only good for four more weeks and there's the Christmas holiday in there (on which they presumably won't make the construction folks work).
They really need to get the rest of this track laid fast now.
The 31st is the final day they have the permit for the large crane. But there's nothing saying that they can't use smaller cranes for the work after that. They just need to finish with the work that the large crane needs to do.Side note: they really need to get a move-on on this construction.
We saw a seemingly impossible speed at first which has almost predictably slowed the past few weeks.
But now it's December and their crane permit is only good for four more weeks and there's the Christmas holiday in there (on which they presumably won't make the construction folks work).
They really need to get the rest of this track laid fast now.
I think what @Jahrules was saying is that they need to have the crane work done before the FAA waiver expires. Though they technically have until 1/17/2021 to do so apparently.. They did specify the work schedule to be through December or this year though initially.
Edit: this is directly from the FAA determination
View attachment 18958
You are correct! Meant to say (mythical) Griffons.I’m pretty sure the construction professionals have got it covered.
Side Note: Geese don’t have talons.
"Come face-to-face with the king of all gods"... ?I just rode by Busch, it appears something tall and black is sitting ontop of the tophat 0.o
We use essential cookies to make this site work, and optional cookies to enhance your experience.