On Sunday, May 8, I was riding the train with Mom back in the handicap section. I had plenty of time to talk with the conductor. We discussed a possible train station that could be located near the Festhaus/Festhaus Park area. When riding the train, on the right side, starting looking down once you cross the Rhine River Bridge. You'll see a series of survey stakes that BG is using for testing stopping and starting locations for the trains. The conversation with the conductor is that they are in the testing phase to determin if the train can stop and then restart from various locations along the track after the Rhine River. We may not notice it, but the track is not level and they do have concerns over the uphill and downhill runs.