It's a lift restart issue. If any of the lifts stop, even for a normal block set-up, a team member has to go to the lift to restart it. It was a safety feature Arrow installed on their multi lift rides to my understanding.
This would be, as stated below by @AIR, because that midcourse into the cave is flat. To restart the ride they first have to winch the train past that to where gravity can take over and then restart the ride, i believe.Do you know why they can’t dispatch until the train clears the MCBR? It doesn’t seem like it would be a blocking issue since the lift can function as a block.
It's a lift restart issue. If any of the lifts stop, even for a normal block set-up, a team member has to go to the lift to restart it. It was a safety feature Arrow installed on their multi lift rides to my understanding.
LNM hasn't had any major controls system upgrades since the 80's. I'm guessing the park knows the ride is safe and that there is not much money to be saved by upgrading it. A lot of my clients still use that same PLC system and will only change it if it will make them more money or will save enough by reducing maintenance costs.Interesting - I've heard most Arrows had this kinda thing for block brakes setups, but I thought most had been reprogrammed to allow station op or automated control.
This would be, as stated below by @AIR, because that midcourse into the cave is flat. To restart the ride they first have to winch the train past that to where gravity can take over and then restart the ride, i believe.
Reading is hardIt also amuses me that the last several pages of this thread are the same exact topic repeated over and over.