Login or Register to Hide This Ad

Zachary

BGW Eggspert
Administrator
Sep 23, 2009
15,199
42,802
260
yeah it's been running controls and off side as one person and one load side lately without an entrance person.

Yeah, a TOTAL crew of two, right?

Op 1: Controls and Unload-side Restraints
Op 2: Load-side Restraints
 

ControlsEE

I probably should be working...
Oct 2, 2018
1,177
2,518
250
Yeah, a TOTAL crew of two, right?

Op 1: Controls and Unload-side Restraints
Op 2: Load-side Restraints
That's just awful. Definitely a result of low employees. Assuming they schedule it that way and it's not a day of call off issue, they only need to hire 5 or 6 people for the ride period (2 positions with 1 breaker to run the ride for a day, rotated though each day so everyone has at least 1 day off each week). For reference, in my day a 4 person staffed ride may hire 15-20 people for peak season. The largest I did was Verbolten at 35 (10 total positions with 3 breakers).
 
Last edited:

Travis...

Professional Pantheon Simp
Jul 7, 2019
852
1,263
220
SeaWorld Parks & Entertainment
  • Like
Reactions: Brambo and Zachary

Jonesta6

Glumble
Feb 14, 2019
4,007
3,737
250

ControlsEE

I probably should be working...
Oct 2, 2018
1,177
2,518
250
I love how they stripped out the valuable pieces to them and pretty much just left the fiberglass shell and seat cushions for the auction... lol, still a neat idea to raise money for a good cause
 

horsesboy

DarKoaster stalker
Advisory Panel
Silver Donor
Jun 16, 2013
4,191
9,049
250
I love how they stripped out the valuable pieces to them and pretty much just left the fiberglass shell and seat cushions for the auction... lol, still a neat idea to raise money for a good cause
My understanding was much if not all that was stripped is on the current trains which still use the old chassis
 
  • Like
Reactions: Jonesta6
Login or Register to Hide This Ad