New Permits filed with the Southwest Florida Water Management District suggest the removal of the Splash Attack water play area. The plans call for "removal of 14,329 s.f. of existing concrete walkways/impervious area and the construction of approximately 16,435 s.f. of new concrete walkways/impervious area. The project will result in a 2,106 s.f. increase in impervious area."
See the attached PDF file for the permits filed with the SWFWMD.
See the attached PDF file for the permits filed with the SWFWMD.